Distribution grid bottlenecks become a key constraint in local power trading
Distribution grids are emerging as one of the less visible but increasingly binding constraints on electricity trading across south-east Europe.
Distribution grids are emerging as one of the less visible but increasingly binding constraints on electricity trading across south-east Europe.
Curtailment is increasingly shifting from a technical grid constraint into a central market and trading risk across south-east Europe. As
Albania’s solar-plus-storage strategy is becoming increasingly relevant for regional electricity trading because the country’s core market exposure is still driven
Romania’s Siminoc Hybrid Wind-Solar Park, being developed by Eurowind Energy Romania, highlights a growing shift in how renewable-energy projects are
Romania’s proposed compressed-air energy storage (CAES) project, developed by Hagag Europe and Airengy, introduces a potentially transformative model for long-duration
North Macedonia’s Čebren pumped-storage project has the potential to reshape the country’s position within the regional electricity market. At present,
Serbia’s Đerdap 3 pumped-storage project could become one of the most valuable price-spread assets in the Balkan electricity market. Its
Battery storage can effectively capture short-term market volatility, but south-east Europe still faces a significant shortage of long-duration flexibility. This
The next phase of Southeast European electricity trading will be increasingly defined by battery dispatch behaviour. Until recently, intraday pricing
Bulgaria is emerging as the first meaningful battery-driven electricity trading market in Southeast Europe. The expected expansion toward around 3
The planned expansion of electricity transmission capacity between Türkiye and Bulgaria could become one of the most consequential trading developments
Albania’s LNG agreement illustrates how gas markets can be effectively constructed through long-term contracting ahead of full demand development. The